RCE -
Sheffield
Project details
200m drill under the River Don and Rail Lines at Sheffield
2x225mm and 1x125mm in mudstone
Piloting out with the Mud/Motor and Gyro from Brownline utilising our Vermeer D100x140 and MR1000 Mud Re-Cycler.
Project completed within time duration.