RCE -
Sheffield

 
 

Project details

  • 200m drill under the River Don and Rail Lines at Sheffield

  • 2x225mm and 1x125mm in mudstone

  • Piloting out with the Mud/Motor and Gyro from Brownline utilising our Vermeer D100x140 and MR1000 Mud Re-Cycler.

  • Project completed within time duration.