JSM -
Stockport

 
 

Project details

  • 3x HDD’s under the River Tame at Stockport utilising our brand new Vermeer D40x55 S3.

  • 3x180mm and 2x110mm in each bore by 190m length with a 5m seperation.

  • Very challenging job completed in 3 weeks. Ground conditions starting in landfill going down to sands/gravel and clay.