D&G Utilities Ltd -
Deeside

 
 

Project details

  • UTX Crossing installing 3 bores in very tricky ground conditions (tidal flat deposits).

  • Bore 1 was a single 180mm Gas Main by 145m at a depth of 12m.

  • Bores 2 & 3 consisted of 3 x 180mm Electric Ducts by 145m lengths to a depth of 12m.

  • Vermeer D40x55 Long Rod

  • Completed on time