RCE -
Winvic Silver Site, Rugby, Crick.

 
 

Project details

  • Client: Roger Civil Engineering Limited

  • Location: Winvic Silver Site, Rugby

  • Duration: 6 weeks - completed 1 week ahead of schedule

  • Utilised: Vermeer D40DR Rock Drill for Pilot Bores

    Reaming and Installation Vermeer D100S3

    Vermeer MR1000 Recycling Unit

    30 Cube Hydration Tank

  • Ground Conditions: Hard mudstone

  • Installation: Network Rail Crossing - HV Electric Ducts 4x180mm in a single bore x2

  • Completed all butt-welding and internal de-beading of the pipe